Pages

January 18, 2012

A Blitz of Summery Colours..

The winter coloured tea towels are done!  I wove each one about 35 inches to allow for hems and shrinkage.  They are currently about 19.5 inches wide.  The last one was a bit iffy.  I'd already realized that I'd likely get only a square from the last of the loom waste.  As I approached the square measurements, I still had thread in the shuttles, so I just kept going.  I'll admit there was a bit of clearing the shed with my hand before each shot by the time I got to the end of the towel.  I almost made it.  By 34.5 inches, I'd had enough and left it at that.  I had only about 6 or 7 inches of loom waste left behind the heddles.  Not my favourite way to weave but at least it was an economical use of the yarn!

Then I started to prep for a guild presentation on natural dyes.  I wanted to show that natural dyes could be exciting for the modern weaver and spinner.  Two days before the presentation an idea of doing a natural dyed painted warp had my thinking cap on.  I knew how to do it, but didn't have the right equipment for steaming it, nor enough suitable white wool yarn with which to experiment.  As well, lets face it, it was two days before the presentation and planning a new project and winding the warp would add more time than I thought I had.  Instead, I took the last skein of yarn from the Jessie fleece that I spun and two skeins of natural white superwash sock yarn.  The Jessie skein was just a normal skein from my niddy noddy.  The sock yarn was wound into two separate long skeins, using two chairs placed 6 feet or so apart.  (Note to self...more figure 8 ties!)   I also grabbed the embroidery thread skeins I'd spun up last fall.

After mordanting everything, I had to decide on colours.  The method I tend to use with Madder, requires a long soaking unless I'm using an extract - no extract on hand right now.  Logwood is a never exhausting dye bath and I didn't want that.  What I wanted was warm and sunny, summer colours.  I hunted through my dyes and found a jar of Black Oak bark that I'd purchased last year and not yet tried.  This was the perfect time to try something new.  So Monday afternoon, I simmered the Black Oak, then not having a strainer fine enough to remove the bark shavings,  I started dyeing.   Oohhhh a lot of nice yellows which are supposed to be very, stable and fade resistant.  I dipped in only part of the Jessie skein.  When it came to the sock yarn skeins, I folded them in half and then in half again, to make a manageable skein and dipped only the ends of the skeins in.   I would use Indigo as the second colour, making green the secondary shade and certainly, those would be the colours of summer!


Yesterday, a phone call got me off to a bit of a late start, but after lunch, I was waiting for the final reduction of the Indigo vat.  All afternoon I was reminded why Indigo dyeing is so much fun.  Put the yarn and fibre into a vat which doesn't look like it should dye blue.  Pull it out and presto, as the air hits it, it turns from green to blue.  It never fails to excite me.  I realized after my skeins were dyed that there was still a lot of pigment in the pot.  I measured out 100 grams of white superwash Merino and tossed it in the pot.  Two dips later, it was a lovely shade of blue.  100 grams should be enough for me to spin up for a pair of socks.
Sock yarn, dyed with Black Oak and Indigo
Superwash Merino dyed with Indigo
It was certainly a colourful day yesterday!  I was able to use the dyed yarns as part of my presentation.   The guild members were find the humour in my passing around still wet skeins as they hadn't had a chance to dry before I left the house. 

January 13, 2012

It Feels Like Winter Projects...

Winter is back and today is a cold, snowy , blustery day.  It's white out there and I have found myself craving colours of summer.   Of course this is what I've been doing lately..

 More log cabin... 1,2,3,4,5,6,7,8,9,10 - switch shuttle order.. 1,2,3,4,5,6,7,8,9,10, - switch shuttle order.  I'm getting a wee might tired of counting to 10!  I'm on tea towel number 4 - let the countdown begin.  At least that is starting from 10 backwards.
I also think that perhaps using the soft khaki brown/green colour was a bad choice for this time of year.  It should have been daffodil yellow or rose pink or geranium red or summer sky blue....

 The reincarnation of the cabled hat.  It's a plain ribbed hat.  It was easy to knit although it took  more yarn than I'd anticipated as I tightened up the tension a bit so that it would be warmer.  It fits.. yay.. and yes, it's toasty warm.  It's also very comfortable to wear, which is a bonus.  I'd have to say it's not horribly stylish or even that attractive, but it serves its purpose.  Even better is that since today winter came back, it's finished and I can wear it out to feed the chooks!   Notice the lovely grey colour though.  ugh... goes with everything I own, might get confused with one of my son's hats since it's the same colour although different style and  the dull grey blends in with the skies this time of year.  Did I mention it's comfortable to wear?  That's why it's staying just as it is.

I'm working on the second bobbin of the South African Merino blend top.   It's lovely to spin.  It's making really nice yarn singles and I am chomping at the bit to ply it up to see a finished product.

I think  that maybe the next fibre I spin, should be dyed first.   I have noticed though, that I much prefer spinning naturally colour fibres than previously dyed fibres.  At least there is a hockey game tomorrow night and that is prime spinning time!  

January 08, 2012

It Shouldn't have been Rocket Science

Finally, the loom is dressed and I'm weaving.  It should have been simple but I turned it into rocket science.  It's a simple colour pattern and only tabby weave.  Once I sat down at the loom, I had the heddles threaded in record time.  Unfortunately, I managed to muddle up the colour order in one block and kept it that way for a few repeats, miraculously changed it back to normal in the middle of another pattern block  and went on until the the end when I did the same for 3 more blocks.   Thankfully, I allowed enough extra warp for substantial sampling, so I had no worries about weaving out tests.  It only took a short time to figure out my errors and fix them, but it's been a while since I've made that big a mistake in threading!  The moral of the story is, don't put in a movie which you haven't seen in a long time, or you'll watch it, instead of watching the heddles.  
The first tea towel has been woven and there are another 4 or 5 to finish off.  It's only a 6.5 yard warp and I'm weaving the towels to about 35 inches to allow 2 inches for hems and 3 inches shrinkage.  That's about 5 with loom waste, which usually gives me 6 towels.  I don't count on that last one though, it's like a bonus to have it actually work out.

The hat is finished.  Enough said about it.  I'm looking for a small child who needs a lovely cabled, soft, wool winter toque.

What's wrong with this photo?  This was our driveway yesterday.   A few days ago, we had snow and pictures of the chooks hanging out in it.  They were playing in the puddles of melted snow yesterday and again today.  We usually get a January thaw, but it's only a few days.  It isn't normally a thaw with only a few days of winter.  I'm not complaining mind you.  I'm not a huge fan of lots of snow, bitter temperatures and biting winds.  It's just different.  When winter actually comes, we'll be all taken quite by surprise, I'm sure.   This was taken from inside the house, hence the glare.

The seed catalogues are in already.  I was amazed that the first few came in November.  I was waiting on one and it came a few weeks ago.  I normally wait for a snowy, blustery day to hunker down with a huge cup of herbal tea and figure out my seed order.   I may have to change my routine this year.   I did get a fresh batch of Dyer's Knotweed seeds ordered.  They should be arriving in the next week or so.  As they are cold sensitive, I'll have to watch the mail box just to make sure they don't get frosty.

December 30, 2011

Last few projects of December

I will admit that the last few days have not been as productive as I'd like.  Not necessarily because I wasn't doing anything but because of stupid mistakes.  I've been knitting or rather, trying to knit myself a hat.  I had a design in mind, using cables.   I swatched, started knitting and it was huge.  I ripped it back, reknit and it was too small.  I worked out my pattern for repeats, adjusted the size upward and it was still too small.  For some reason, when I redid the pattern, I cast on a size or 3 smaller than I wanted again.  I even used fewer stitches than the previous too small hat!    Brain stall on that one, for sure.

Winter has finally arrived.  The weather got cold and it snowed.   My chooks have been out in the snow before but would avoid it if at all possible.  I thought they might stay inside when we finally had enough snow to cover the ground.   Nope, they are stoic creatures.  While obviously not fond of it, they will wade through it.  A few of the girls are quite adventurous and I've seen them all over the yard.  The rest stick to the back, where there is some shelter and they can wait on deck for me in the afternoon.  When I go out to feed them each afternoon, they are flocked right by the backdoor, waiting for their scratch grain treat and any other goodies I might have for them.   It does lead to a few chicken "bombs", being left, littering the deck.  One does have to be careful where one steps.

My son painted me a picture, using one of my photos as inspiration.   Okay, not exactly that photo, but one from the same vantage point, same time, same snowstorm etc..  just one which is on another computer at the moment and I've not transferred them yet.  It was a very moving gift, for sure.

I've started dressing the loom.  I ended up rejigging the pattern for this project.  It was a bit of a last minute, rushed changed, so we'll see if I got it right, when I finally finish threading heddles and do some test weaving.  I am dressing the loom front to back, because my arm reach is a bit too short to comfortable do it back to front on this loom.  The Minstrel spinning wheel has been back in action, spinning some lovely South African top.   It's supposed to be mainly merino, but blended with other wools.   It's amazingly soft and easy to work with.   It will become something lovely and warm!

December 21, 2011

Two more projects.........

I thought for certain, that the moment I finished up the new mittens, that the old one's would surface.  That didn't happen, so I guess that my first pair of new mittens this year, really did get lost and not just misplaced.  I thought that I had better hurry up and finish the new, new mitts.  This mild weather isn't going to last forever and one day we're going to wake up and it really will be winter: cold, snowy and icy.  They are  softer than the Clun Forest mittens but the Clun Forest was a whiter, white - if that makes sense and a much stronger wool.  It was also spun woolen for warmth, whereas the Shetland was spun semi-worsted from necessity.

A group of gals from the Oxford Spinners and Weavers got together to do an 8 shaft,  block twill scarf project from silk.  I wove mine off in the fall.  Last week, a call went out for someone to weave off the last scarf before Christmas as the last person on the list was unable to do so.  After a few days, I put my hand up since I too, wanted my scarf for a present.  I used a different shade of green for the weft of each scarf. It's a fairly simple pattern to weave and it really was only a 2 hour weave per scarf.   It was really interesting to see the differences in weaving techniques and weft colour choices, when we cut all the scarves off.  There were 3 black wefts, a blue, a yellow and a red weft, besides my 2 greens.   I still had to hemstitch, after the fact, since I had forgotten to bring a needle with me, both times I went to weave.  Nasty, slippery stuff to hemstitch afterweaving!   Plus all that fringe needed twisting.  I'd moved where I keep the fringe twister and did panic for a moment when I couldn't find it.  I did find it, in a bin labeled FibreTools.. go figure that one!  I've most of them twisted and it makes a very fine scarf, indeed.  I lust after 8 shafts even more now, after playing with one!

 The shirt has been taken off the to do list..  It might have gotten started if the fabric I was going to use, was as I remembered it.  It wasn't!  It was totally different and not appropriate.  Rather than panic or rush, I knocked it back until after the holidays.  No use stressing over it.

Tomorrow is the Winter Solstice!  Thank goodness!!!!!!  These short, dark, dreary days are getting tiresome.   I look forward to the increasingly long days.

December 15, 2011

New mitts and the before Xmas to do list

So the white Clun Forest mittens have disappeared.  I've gone and lost them before I'd even had a chance to wear them!  I'd only gotten to try them on for fitting.   I'm pretty ticked at this.  I may have put them in a safe place or I may have taken them with me and left them behind.  I figure that winter really will set in sometime and I'll really, really need mitts, so I started a new pair.  I had two skeins left from Jessie's fleece and since the fingerless mitts I'd made with this yarn turned out quite nicely, I decided to use the rest for my own mitts.   As I was winding the skeins into yarn cakes, I realized that they were two different grists.  I used the skein of slightly fatter yarn for the mitts, hoping there would be enough.  There was a little less than I thought there would be.  So, next job is to card up some more of Jessie's fleece and spin the rest of the mitten yarn.


I did a bit more sewing - two knitting project bags.  I've found these to be incredibly useful.  You take all the bits and pieces for whatever project you're working on and stuff them in the pretty sack.  I try to put in all the tools I'd need, like tape measure, pattern, darning needle and thread snips.   Then when I put the project down for a bit and pick it up weeks later, everything is in one place and finishing up goes so smoothly.

Left on the to do list - a tote bag, a shirt, two embroidered labels, one loom to dress, one project to weave off at the guild, and a partridge in a pear tree.. okay maybe not the last one :).  All in all, it should be close to achievable - the shirt is a last minute addition and I'm crossing my fingers on that one.

December 10, 2011

Friday Night Sew In Success

I'll have to admit that I did a bit of sewing during the day as well, but in all I marked the quilt borders, quilted the borders, cut and made the binding, and bound the quilt yesterday, finishing up just before 10 pm.  Included in that was a repair to the treadle belt as it had stretched.   The belt is leather and a new one will stretch a bit after using.  In this case it started slipping miserably and I managed to sew my finger while wrangling the quilt through the sewing machine.  Thankfully it was minor as the treadler responds very quickly in situations like that!

The two major projects I'd wanted to get done before Christmas, are both done.  While I was somewhat singularly focused on the quilting over the past couple of weeks, it is such a huge relief that they are finished. And no, I'm not making quilts for the other two kids this year.  I'll plan that a little more carefully and give myself more than a few weeks to accomplish that task!

Only 3 more projects to sew for pressies... I guess the countdown begins